Project:

Zerokilo Ambas Bhorle Parchyang Road

Zerokilo Ambas Bhorle Parchyang Road
1 / 1

Project Overview

This project involves the construction and/or upgrading of the Zerokilo–Ambas–Bhorle–Parchyang Road to improve transportation access and ensure safe, reliable, and all-weather connectivity for local communities. The scope of work typically includes earthwork for road widening and formation, pavement construction or improvement, drainage system installation, and construction of necessary protective structures.
Major activities include site clearance, excavation and embankment construction, subgrade preparation, laying of base and surface pavement layers, construction of side drains and cross-drainage structures, and installation of road safety features such as signage and markings. Where required, retaining walls, breast walls, gabion structures, and slope stabilization works are carried out to enhance road stability and durability.

Project Details

Employee

Infrastructure Development Office (IDO, Nuwakot)

Location

Nuwakot

JV/Single Firm

Dhukuchhu/B&B JV

Ongoing
Share Project